HMAS Parramatta IV Ltd Medallion SLEEPING MAT 600mm (W) x 325mm (H)
Yard notes & kiln story
Description
HMAS Parramatta IV Ltd Medallion SLEEPING MAT 600mm (W) x 325mm (H) 600mm (W) x 325mm (H) x 2omm (D) Open The attack was launched by the 1st Brigade in the late afternoon of 6 August 1915 following a long artillery bombardment